Standalone or co-located battery energy storage systems that balance the grid, firm up renewable generation and earn from a stack of flexibility and capacity revenues.

Containerised power equipment beside a solar array – representative photography

Batteries earn by responding to the grid in seconds. Our optimiser trades across markets to keep the asset working all day.
| Configuration | Power | Energy | Footprint | Best for |
|---|---|---|---|---|
| Behind-the-meter | 0.5–5 MW | 1–10 MWh | Plant yard | Industrial users, peak shaving |
| Co-located with solar / wind | 5–50 MW | 10–100 MWh | +1–3 acres | Shared grid connection |
| Standalone grid-scale | 20–100 MW | 40–200 MWh | 2–5 acres | Grid services and trading |
| Data Centre UPS + BESS | 1–10 MW | 2–20 MWh | Within compound | Backup power and grid services |
Containerised systems with detection, suppression and spacing designed with the fire service.
State of charge, availability and revenue streamed to all stakeholders.
Tier 1 cells with capacity warranties and augmentation planned into the model.
Modular containers delivered and commissioned once the grid connection is ready.
Factory-built containers lifted into place
Battery and power-conversion racks
Connection to the high-voltage grid
Representative photography.
| Size | Project cost | EPC finance (85%) | Equity (15%) | Value to landowner a year | Landowner share, 20 yrs |
|---|---|---|---|---|---|
| 20 MW / 40 MWh | £11.4m | £9.7m | £1.7m | £56k | £6.7m |
| 25 MW / 50 MWh | £14.2m | £12.1m | £2.1m | £70k | £8.4m |
| 50 MW / 100 MWh | £27.5m | £23.4m | £4.1m | £0.18m | £17.4m |
| 100 MW / 200 MWh | £52.0m | £44.2m | £7.8m | £0.50m | £36.8m |
Indicative base case: 2-hour system, stacked revenue of £72k per MW a year, operating costs and augmentation reserve £18k per MW, 20-year term. EPC finance 6% over 15 years; costs and revenue indexed at 2.5% a year. Subject to survey, planning, grid and offtake contracts.