One unit. Power, heat and CO2.

Gas turbine CHP for factories, hospitals, universities, greenhouses and heat networks, built around the Arkhitekton Energy UE-7. Power by private wire below your grid price, heat at a discount, and £0 upfront.

87%total efficiency in CHP (UE-7)
54.8 GWhelectricity a year per unit
104 GWhrecoverable heat a year
31 ktCO2 capturable a year
Heat recovery options

Turn exhaust heat into whatever the site needs

Steam

Process steam via a heat recovery steam generator, with optional supplementary firing.

Hot water

District heating, greenhouses, food and drink, leisure and pools.

Chilled water

Absorption chilling for Data Centres and cold stores.

CO2 capture ready

Exhaust CO2 for greenhouse, food-grade or storage offtake.

Commercial options

Three ways to buy

1

Equipment supply

UE Series generator set delivered, installed and commissioned, with factory acceptance testing.

2

Turnkey plant

Complete CHP plant by CITCC — civils, gas, grid, heat recovery and controls, at a fixed price.

3

Funded energy service

£0 upfront. Power by private wire below your grid price and heat at a discount to your current cost.

UE-7 in CHP – one unit, typical year

54.8GWh electricity
104GWh recoverable heat
87%total efficiency
8,000operating hours

Typical host sites

Food & drinkBreweries & distilleriesGreenhousesHospitalsUniversitiesPaper & boardChemicalsDistrict heat networksData CentresLeisure & pools
Sizing CHP

Choose the turbine by heat demand

ModelElectrical outputEfficiencyRecoverable heat*Best for
UE-22 MW21%~6 MWthSmall sites, low-calorific gas, hydrogen blends
UE-33 MW23%up to ~11 MWthDistributed energy, hydrogen blends
UE-76.85 MW30.1%~13 MWthFactories, hospitals, campuses, Data Centres
UE-2525 MW35.5%~33 MWthLarge industrial sites and heat networks

ISO conditions, natural gas. *Recoverable heat estimated to a 120°C stack; actual output depends on the heat recovery design. UK typical year assumes 8,000 hours.

Funding and delivery

CHP projects use the standard Arkhitekton model: 85% EPC finance, 15% guaranteed, a 50/50 joint venture with the landowner and a fixed-price turnkey EPC.