Prefabricated, AI-ready Data Centres for university and college campuses, business parks and industrial sites. Built turnkey by CITCC with a UK Tier 1 civils partner, run by UK staff, and sold to capacity buyers in 1 MW blocks.

Illustration – UD Series modular layout with power module and transformer
The UK needs far more AI-capable Data Centre capacity, but large sites are stuck in the grid queue. Campuses and industrial sites often have spare grid capacity today. A UD module uses it, and can be delivered in about a year from financial close.
Sources: DSIT compute roadmap; Ofgem via TechRadar (Oct 2026); datacentres.com (Sep 2026).
| Module | IT load | Racks | Cooling | Footprint | Grid supply | Design PUE | Typical site |
|---|---|---|---|---|---|---|---|
| UD-250 | 250 kW | 13 at 20 kW | Air + rear door | ~110 m² | 0.36 MVA | 1.35 | FE colleges, edge |
| UD-500 | 500 kW | 20 at 25 kW | Air + rear door | ~180 m² | 0.68 MVA | 1.30 | Smaller universities |
| UD-1000 | 1 MW | 25 at 40 kW | Direct-to-chip liquid | ~250 m² | 1.32 MVA | 1.25 | Universities, AI inference |
| UD-2000 | 2 MW | 50 at 40 kW | Direct-to-chip liquid | ~450 m² | 2.57 MVA | 1.22 | Research-intensive campuses |
| Module | Project cost | CITCC finance (85%) | Equity (15%) | Value to host a year | Host cash share, 20 yrs |
|---|---|---|---|---|---|
| UD-250 | £3.2m | £2.7m | £0.5m | £0.12m | £2.4m |
| UD-500 | £5.9m | £5.0m | £0.9m | £0.25m | £5.2m |
| UD-1000 | £10.7m | £9.1m | £1.6m | £0.72m | £11.4m |
| UD-2000 | £20.2m | £17.2m | £3.0m | £1.53m | £24.9m |
Indicative base case: 85% of capacity sold at £220/kW/month, CITCC loan 6% over 15 years. Subject to survey, planning, grid and buyer contracts.
Data Centres are designated Critical National Infrastructure in the UK. CITCC's parent is China Telecom Group, so every UD Series site keeps CITCC as builder only and is run by a UK operator.
Each site is owned by a UK-incorporated, UK-managed company and run by UK-based staff.
CITCC has no remote or network access to control systems or customer data; site visits are escorted.
BPSS for unescorted access; ISO/IEC 27001, NCSC Cyber Assessment Framework and NPSA guidance.
Facility networks are split from the campus network; equipment chosen with the host's IT security team.
Each equity deal is assessed for notification under the National Security and Investment Act 2021.
Reserved capacity follows the host's Trusted Research, export control and ATAS procedures.
Where the grid is the constraint, one UE-7 supplies about 6.85 MW — enough for roughly five UD-1000 modules at a PUE of 1.25 — with its exhaust heat driving absorption chillers or a heat network.
See UE Series gas turbines →
UD Series Data Centres projects use the standard Arkhitekton model: 85% EPC finance, 15% guaranteed, a 50/50 joint venture with the landowner and a fixed-price turnkey EPC.