Arkhitekton Energy – The Arkhitekts of Global Change
arkhitekton-energy.com / Sectors / Data Centres
Modular Data Centres · 250 kW to 2 MW

Arkhitekton Energy UD Series Data Centres

Prefabricated, AI-ready Data Centres for university and college campuses, business parks and industrial sites. Built turnkey by CITCC with a UK Tier 1 civils partner, run by UK staff, and sold to capacity buyers in 1 MW blocks.

Illustration – UD Series modular layout with power module and transformer

4modules, 250 kW to 2 MW IT
40 kWper rack with liquid cooling
85%of build funded by the EPC contractor
£0capital from the host site
Why modular, why now

Capacity where the power already is

The UK needs far more AI-capable Data Centre capacity, but large sites are stuck in the grid queue. Campuses and industrial sites often have spare grid capacity today. A UD module uses it, and can be delivered in about a year from financial close.

6 GWAI-capable capacity the UK says it needs by 2030
73 GWData Centre demand waiting for grid connections (Ofgem, June 2026)
45 GWUK grid capacity against that queue
3.8%London Data Centre vacancy

Sources: DSIT compute roadmap; Ofgem via TechRadar (Oct 2026); datacentres.com (Sep 2026).

The range

Four modules for every kind of site

ModuleIT loadRacksCoolingFootprintGrid supplyDesign PUETypical site
UD-250250 kW13 at 20 kWAir + rear door~110 m²0.36 MVA1.35FE colleges, edge
UD-500500 kW20 at 25 kWAir + rear door~180 m²0.68 MVA1.30Smaller universities
UD-10001 MW25 at 40 kWDirect-to-chip liquid~250 m²1.32 MVA1.25Universities, AI inference
UD-20002 MW50 at 40 kWDirect-to-chip liquid~450 m²2.57 MVA1.22Research-intensive campuses
Power
  • Dual A+B feeds to every rack
  • N+1 UPS and batteries
  • Standby generators on HVO, 24-hour autonomy
  • Transformer and HV switchgear
Cooling
  • Direct-to-chip liquid to 40 kW a rack
  • Facility water about 30–45°C
  • Rear-door option for air-cooled racks
  • N+1 cooling plant
Security
  • Fenced compound and CCTV
  • Two-factor access control
  • 24/7 UK network operations centre
  • BPSS-vetted staff
Connectivity
  • Diverse fibre to at least two carriers
  • Janet connection on university campuses
  • Separate from the host's network
  • Remote hands included
Funding and returns

85% EPC finance, 15% equity, 50/50 with the host

ModuleProject costCITCC finance (85%)Equity (15%)Value to host a yearHost cash share, 20 yrs
UD-250£3.2m£2.7m£0.5m£0.12m£2.4m
UD-500£5.9m£5.0m£0.9m£0.25m£5.2m
UD-1000£10.7m£9.1m£1.6m£0.72m£11.4m
UD-2000£20.2m£17.2m£3.0m£1.53m£24.9m

UD-1000 – steady-state year

£4.08mrevenue
£1.47mEBITDA after power and operating costs
£0.94mCITCC debt service
£0.53mnet cash, split 50/50
~17%equity IRR, payback ~8 years

What the host receives

  • 50% of net distributable cash every quarter, open-book
  • 10% of capacity reserved for research and teaching at the cost of power
  • Free waste heat to its heat network from liquid-cooled modules
  • £1 a year peppercorn lease for a plot of about 600 m²; no capital, no borrowing

Capacity buyers

  • Host university or college — 10–15 yr reserved, 10–30% of IT
  • Other universities — 3–5 yr colocation, 50–250 kW
  • NHS trusts and councils — 5 yr colocation, 50–300 kW
  • GPU cloud providers — 3–7 yr take-or-pay, 250 kW–1 MW
  • AI start-ups, financial services, enterprise

Indicative base case: 85% of capacity sold at £220/kW/month, CITCC loan 6% over 15 years. Subject to survey, planning, grid and buyer contracts.

Security and compliance

Built for campus security reviews

Data Centres are designated Critical National Infrastructure in the UK. CITCC's parent is China Telecom Group, so every UD Series site keeps CITCC as builder only and is run by a UK operator.

UK operator

Each site is owned by a UK-incorporated, UK-managed company and run by UK-based staff.

No access after handover

CITCC has no remote or network access to control systems or customer data; site visits are escorted.

Vetting and standards

BPSS for unescorted access; ISO/IEC 27001, NCSC Cyber Assessment Framework and NPSA guidance.

Separate networks

Facility networks are split from the campus network; equipment chosen with the host's IT security team.

NSIA check

Each equity deal is assessed for notification under the National Security and Investment Act 2021.

Research security

Reserved capacity follows the host's Trusted Research, export control and ATAS procedures.

Power and compute on one site

Pair UD with a UE-7 gas turbine

Where the grid is the constraint, one UE-7 supplies about 6.85 MW — enough for roughly five UD-1000 modules at a PUE of 1.25 — with its exhaust heat driving absorption chillers or a heat network.

See UE Series gas turbines →
Funding and delivery

UD Series Data Centres projects use the standard Arkhitekton model: 85% EPC finance, 15% guaranteed, a 50/50 joint venture with the landowner and a fixed-price turnkey EPC.

How the model works →Start a project