From multi-megawatt solar farms to rooftop and building-integrated PV across commercial estates, we fund, build and operate solar assets with optional battery co-location and long-term offtake.

Utility-scale solar farm in open countryside – representative photography
Every scheme is modelled on site-specific irradiance, grid headroom and planning context before a term sheet is issued.

| Typology | Capacity | Footprint | Grid | Revenue | Typical site |
|---|---|---|---|---|---|
| Rooftop / carport | 0.1–5 MW | Existing roofs | LV / 11 kV | Private-wire PPA | Industrial, campus, NHS |
| Small solar farm | 5–20 MW | 15–60 acres | 11–33 kV | PPA + export | Farmland, brownfield |
| Utility solar farm | 20–80 MW | 60–200 acres | 33–132 kV | CfD or corporate PPA | Large rural sites |
| Solar + BESS hybrid | 20–80 MW + storage | +1–5 acres | Shared connection | PPA + flexibility | Grid-constrained sites |
Indicative bands. Capacity per acre depends on layout, topography and planning conditions.
Irradiance, shading and topography modelled per site; agricultural land grade and biodiversity reviewed early.
DNO applications, connection offers and queue strategy managed end to end.
Grazing, wildflower margins and hedgerow planting designed into the layout.
Reinstatement defined up front and secured by reserve or bond.
Ground-mount arrays on a grazed field
Aerial view of fixed-tilt rows
Bifacial modules on a tracker row
Representative photography.
| Size | Project cost | EPC finance (85%) | Equity (15%) | Value to landowner a year | Landowner share, 30 yrs |
|---|---|---|---|---|---|
| 25 MW | £14.0m | £11.9m | £2.1m | £81k | £18.7m |
| 40 MW | £22.0m | £18.7m | £3.3m | £0.15m | £30.2m |
| 60 MW | £31.8m | £27.0m | £4.8m | £0.27m | £46.0m |
| 80 MW | £41.6m | £35.4m | £6.2m | £0.40m | £61.9m |
Indicative base case: 1,000 MWh a year per MW, PPA plus REGO at £75/MWh, 0.4% annual degradation, 30-year term. EPC finance 6% over 15 years; costs and revenue indexed at 2.5% a year. Subject to survey, planning, grid and offtake contracts.
8-page PDF brochure.
Download the brochure (PDF) → Request a site screenSolar projects use the standard Arkhitekton model: 85% EPC finance, 15% guaranteed, a 50/50 joint venture with the landowner and a fixed-price turnkey EPC.
We use one strictly necessary setting to remember your cookie choice. We do not use analytics or advertising cookies. Learn more