Single-turbine and small-cluster onshore wind developments, with planning support, community engagement and grid connection inside the EPC scope.

Onshore wind cluster on upland grazing land – representative photography
The landowner keeps farming around the turbines. We handle the wind data, the planning, the turbine supply and the connection.

Met mast or LiDAR campaign and energy yield assessment.
Aviation, radar, ecology, noise, landscape and shadow flicker.
Early engagement and a community benefit offer.
Application with full environmental assessment.
Turbine supply, foundations, cabling and grid works.
Turbines, tracks and crane pads use a small fraction of the site; farming continues.
Benefit funds and local investment structured into each project company.
Turbine service agreements with availability warranties from the manufacturer.
Turbines alongside working farmland
Modern 3–5 MW class turbines
Small cluster on arable land
Representative photography.
| Size | Project cost | EPC finance (85%) | Equity (15%) | Value to landowner a year | Landowner share, 30 yrs |
|---|---|---|---|---|---|
| 2.5 MW single | £4.2m | £3.6m | £0.6m | £25k | £6.5m |
| 10 MW | £15.5m | £13.2m | £2.3m | £0.16m | £26.8m |
| 20 MW | £29.0m | £24.6m | £4.3m | £0.42m | £55.0m |
| 30 MW | £43.5m | £37.0m | £6.5m | £0.63m | £82.5m |
Indicative base case: 30% capacity factor, £80/MWh, operating costs £45k per MW, community benefit £5k per MW, 30-year term. EPC finance 6% over 15 years; costs and revenue indexed at 2.5% a year. Subject to survey, planning, grid and offtake contracts.
8-page PDF brochure.
Download the brochure (PDF) → Request a site screenOnshore wind projects use the standard Arkhitekton model: 85% EPC finance, 15% guaranteed, a 50/50 joint venture with the landowner and a fixed-price turnkey EPC.